Customization: | Available |
---|---|
Breaking Capacity: | Low Voltage Circuit Breakers |
Operation: | Electric Type |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General
WSB9LE-80H miniature earth leakage circuit
breaker has functions of protecting short
circuit, overload and earth leakage, controlling,
isolating, mainly applies for LV terminal
distribution of industrial & civil construction,
energy & infrastructure field.
The product meets standards of
IEC/EN 61009-1 and GB16917.1.
WSB9LE-80H
Pole: 1P+N 2P, 3P, 3P+N, 4P
Voltage: AC230V/400V
kA: 6kA, 10kA
Amps: 6, 10, 16, 20, 25, 32,40, 50, 63. 80
Width:36, 54, 72mm
Frame level rated current Inm (A) | 80A | ||||
Rated current In (A) | 6A, 10A, 16A, 20A, 25A, 32A, 40A, 50A, 63A, 80A | ||||
Poles (P) | 1P+N | 2P | 3P, 3P+N | 4P | |
Rated short circuit breaking capacity | Voltage (V) | 230V | 230V | 400V | 400V |
Breaking Icu (A) | 1000A | ||||
cosΦ | 0.7 | 0.7 | 0.7 | 0.7 | |
Rated earth leakage action current I△n (mA) | 30mA | 50mA | 100mA | 300mA | |
Rated earth leakage no action current I△n (mA) | 15mA | 25mA | 50mA | 150mA | |
Tripping type | C/D | C/D | C/D | C/D |
Frequently Asked Question (FAQ)
Q: About the company
A: Westhomes® is a professional manufacturer for low voltage and high voltage electrical products with a thirty-year history.
Main supplier of state-owned companies like China Stae Grid, China Southern Power Grid through bidding with bunches of test certificates, sales records and operation performance to support.
Enough investment for research and development for the products innovation.
Q: About Warranty
A: 18 months from the date of receivement
Q: About shipment method
A: Depends on the required quantity and delivery urgency, both international express like UPS / DHL / EMS / HK EMS / FedEx / TNT (door to door service) and normal sea shipping & air freight also avaliable.
Q: About MOQ
A: Up to the client
Q: About payment method
A: We accept T/T, Paypal, Western union, L/C. Normally 30% payment in advance, 70% before delivery.
Q: About ordering process
A: First to send an inquiry via made-in-china platform or directly to the contact e-mail address. All the following thing is the communication between us.